High level overview
One of Knox Electricals’ current projects for NIE Networks is the installation of a 110KV bay within the existing Tandragee Main 275/110KV Substation, works also consist of installation of a new 110KV AIS Substation at Mullavilly to facilitate the large scale connection of a 50MVA battery storage system for G2 Energy Ltd.
Preparation of the 110KV AIS bay for installation works.
Pre-outage installation works of the Hapam Busbar Selector Isolator – to reduce outage timeframes and reduce working at height.
Installation of Line Isolator with integral Maintenance Earth Switch & Line Earth Switch.
Preparation works associated with installation of a Live Tank ABB LTB 72.5-170D1/B Circuit -Breaker.
Picture from rear view of 110KV bay
High level Busbar Selector Isolator with integral Maintenance Earth Switch support steelwork being craned into position under outage conditions.
Installation of PFIFFNER 110KV Current Transformers.
Installation complete of high-level support steelwork with Busbar Selector Isolator including integral Maintenance Earth Switch.